Rwanda’s connected electric mobility platform

Powering Rwanda’s
Electric Mobility Future

One connected ecosystem for ride, swap, charge, service and responsible investment.

0+E-Motorcycles
0+EV Cars
5-YearExpansion Plan

Connected by design

One Ecosystem. Every Mile.

Four integrated services designed to keep people, batteries and vehicles moving.

01

Ride

Accessible electric mobility for everyday movement.

02

Swap

Quick battery exchange with predictable uptime.

03

Charge

A growing network for two- and four-wheel EVs.

04

Service

Local maintenance, support and fleet readiness.

A market built for movement

Why Rwanda.
Why Now.

  • Policy LeadershipStrong EV and green mobility direction
  • Young & Growing MarketRising urban and mobility demand
  • Clean Energy AdvantageRenewable potential with lower emissions
  • Strategic Regional HubA gateway to East and Central Africa
12M+Population
70%Paved Roads
2ndEase of Business in Africa*
100%Renewable Growth Target*
Aerial view of Kigali, Rwanda
KigaliRwanda’s innovation capital

*Market indicators are presentation content and should be validated against the final investment materials before public launch.

Energy where riders need it

Battery Swapping.
Zero Downtime.

  • Fast TurnaroundDesigned for rapid battery exchange
  • Lower Running CostEfficient energy access for operators
  • Dependable UptimeMore time moving, less time waiting
Discuss the network model
Battery swapping station in Rwanda
NetworkReady

Five chapters. One connected journey.

Five-Year Growth Roadmap

Scroll to move through each stage of Zuna’s expansion story.

  1. Chapter 0101
    2027

    Pilot Launch

    Validate, refine and establish the operating model in Kigali.

  2. Chapter 0202
    Scale

    Infrastructure Expansion

    Grow swap, charge and service capacity around demand.

  3. Chapter 0303
    Reach

    Nationwide Distribution

    Connect priority cities and Rwanda’s transport corridors.

  4. Chapter 0404
    Presence

    New Branches

    Build local operating presence and durable partnerships.

  5. Chapter 0505
    Region

    Regional Franchise

    Expand into selected East African markets responsibly.

01 / 05Scroll to advance
Abdur Rahman, Founder and Director of Zuna Logistics

Founder-led execution

Led by an engineer who has built infrastructure before.

Abdur RahmanFounder & Director

23+Years
Energy &Engineering
RwandaMarket Experience

Investment outlook

Built for Measurable,
Responsible Growth

A phased model that connects fleet expansion, infrastructure rollout and local operating capacity.

Compare Investment Offers
5-year growth outlookIllustrative targets
Year 1Year 2Year 3Year 4Year 5
0+Motorcycles
0+EV Cars
0+Swap & Charge Stations
0%+Projected Annual Growth

*Growth figures shown above are strategic targets for presentation purposes and are not guaranteed financial returns.

Responsible by design

Governed for Trust. Built to Last.

ERP & Reporting

Real-time data, transparency and accountability.

Independent Controls

Strong oversight and compliance framework.

Risk Mitigation

Proactive operational and financial risk controls.

Let’s Move
Rwanda Forward.

Partner with Zuna to power a cleaner, smarter and more connected future.

Scroll to Top